News & Events
Company news
Media reports

“Gonggong” Appeared at the Exposition of International Intelligent Construction High-end Forum

Posted by: 本站编辑; Date:2023-07-24 14:58:08

On July 20, the two-day International Intelligent Construction High-end Forum ended successfully in Beijing. “Gonggong”, the world's first pile-beam integrated bridge erector, developed by CRSIC, was appeared at the exposition, attracting wide attention from the media.

“Gonggong”, tailored for bridge construction in shallow lakes, marshes, environmental protection zones, downtown, and other areas where traditional construction methods cannot be applied, realizes the new bridge construction mode of factory prefabrication, lean management, modular assembly, and intelligent erection by its Beidou positioning system.

On the trend of intelligent construction, CRSIC promotes the "two-wheel drive" of intelligent construction and intelligent manufacturing, and serves the development of construction industrialization. We are going to lead the new developing trend of systematic solutions by integrating construction techniques, equipment and green intelligence, cultivate the integrated service capabilities of two type engineering, i.e. manufacturing + service” and “service + manufacturing”, and thus creating a platform industry that serves intelligent construction.

Legal disclaimer|Privacy protection|Service supportCopyright 2020 China Railway Science & Industry Group Co.,Ltd. All Rights Reserved